MV Trasnformation cabin 36kV for rural areas

Kinshasa (Congo)

Country

Congo

Year

2016

Description

The project has included the installation of a prefabricated compact substation for the electrification of Congolese rural areas.

Design, construction and commissioning of a compact substation 36kV 630A 16kA, made up of a shelter STC-kiosk, low-voltage (LV) switchgears, medium-voltage switchgear ATR and power transformer.

Related projects to Transformation cabin

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

MV Transformation cabin 30kV for electrical grid

Halat (Lebanon)

The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.