Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants
Montalto di Castro (Italy)
Country
Year
Location
Products
Description
The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.
Installation of n. 2 air-insulated (AIS) medium-voltage metal clad cubicles 20kV 2000A 16kA and n. 5 air-insulated medium-voltage metal-enclosed ATR cubicles 24kV 2000A 16kA and a medium-voltage cable ARE4H5E 12/20 1x240 for a centralized supply of five photovoltaic plants in this area (Vivaldi, Verdi, Puccini, Rossini and Paganini).
Related projects
N. 2 MV E-House 24kV and 36kV for photovoltaic plant
Assemini, Loc. Macchiareddu (Italy)
The project was carried out in an electrical substation for the delivery of high voltage (HV) power, situated inside a photovoltaic plant, in one of the most important industrial centres of the southern Sardinia.
HV/MV Substation 115/6.3kV 4.7MVA
Shpellë (Albania)
Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.