BESS PLANT IN SHETLAND ISLANDS
Lerwick (Scotland)
Country
Year
Description
We are energized to share our latest project for a BESS plant 68-MW in Lerwick, Shetland Islands. The battery will contribute to cutting emissions and utilising more renewables on the islands.
For this remote and beautiful area, we have studied, designed manufactured and supplied:
- N. 1 main switchroom 33kV, equipped with medium voltage air-insultaed switchgear, protection panels, HVAC systems, fire detection and automatic extinguisher system, inverter and UPS 110VDC.
- N. 1 control room, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS 230VAC, marshalling panel, interface panels.
- N. 2 LV AC rooms, equipped with low votlage switchboard, protection panels, HVAC system, fire detection and automatic exhstinguisher system, inverter and UPS, marshalling panel, interface panels.
Related projects to eHouse
MV E-House 24kV for electrical grid
Quito (Ecuador)
The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.
MV E-Houses 36kV for diesel power plant
Naypyidaw (Myanmar)
The project was carried out in the capital of Myanmar and it has allowed an increase in the supply of electricity in diesel power plants.