Lighting system

Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)

Country

Tunisia

Year

2016

Description

The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.

Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.

Related projects

N. 11 eHouses and 1 control room for BESS

Eccles (United Kingdom)

N. 11 switchrooms and 1 control room for a major 400MW BESS (Battery Energy Storage System) project in Eccles, United Kingdom.

MV E-House 36kV for electrical grid

Tripoli (Libya)

The project has included the design and construction of n. 3 compact STC-Box substations, aiming to increase electrification in Libya.