N. 4 Power Transformers 40.7MVA in total

Tiranë (Albania)

Country

Albania

Year

2016

Location
Description

The project has been carried out in Albania, in collaboration with the local company OSHEE.

The project has included n. 4 transformers with the following characteristics:

  • 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
  • 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
  • 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
  • 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
in order to increase the power of electrical substations

Related projects

Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants

Montalto di Castro (Italy)

The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.

HV/MV Mobile substation 115/37.5/10.5kV 10MVA

Udënisht, Korçë (Albania)

The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.