N. 4 Power Transformers 40.7MVA in total
Tiranë (Albania)
Country
Year
Location
Description
The project has been carried out in Albania, in collaboration with the local company OSHEE.
The project has included n. 4 transformers with the following characteristics:
- 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
- 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
- 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
- 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
Related projects
Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants
Montalto di Castro (Italy)
The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.