MV E-House 24kV for electrical grid

Quito (Ecuador)

Country

Ecuador

Year

2014

Location
Solutions
Products
Description

The project aims to increase the electrification grid in Ecuador areas which suffer a lack of electricity.

Supply of an SCT-Box shelter containing three medium-voltage metal-enclosed ATR switchgear cubicles 24kV 630A 20kA for secondary distribution.

Related projects to eHouse

E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.

Nr 2 eHouse 33kV switching station – Bumper for BESS

Ilmer, Princess Risborough (UK)

We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.