Description

The project has included the realization of a remote management system with power and control panels for the lighting system in Plaza de la Revolución in Havana.

Design, construction and supply of six wired control panels, P&C type, tested and ready to use, which include RTU modules, converters to the Ethernet network and auxiliary equipment for the operation of the remote management system.

Related projects to Public Lighting

High-Voltage (HV) Electrical Substation 110/34.5kV

Puerto Escondido (Cuba)

The project has involved the supply of material to increase the high-voltage electrical substation (HV) in the developing area of ​​Petrolero, in Puerto Escondido district.

Public lighting 30/200/750 Lux

Havana – Plaza de la Revolución (Cuba)

The ambitious project, carried out in just three months and inaugurated on the occasion of the May 1st, 2019 parade, guarantees a high energy-efficient lighting system in the stunning Plaza de la Revolucion.