Underground Cable 100km 132kV for Substation Interconnection

Varadero (Cuba)

Country

Cuba

Year

2013

Location
Products
Description

The project has seen the laying and start-up of a line cable 132kV with double circuit of 100km for the interconnection of a high-voltage (HV) substation in the Varadero Casco Histórico with other high-voltage substations. The present installation has been carried out between the Casco Histórico and Palmeras areas.

Related projects

MV/MV indoor Substation 13.8/34.5kV 25MVA

Camagüey (Cuba)

Camagüey is a popular holiday destination in Cuba, where the recent increase in the power demand has made it necessary to invest in the implementation of new electrical substations.

HV/MV Substation 115/6.3kV 4.7MVA

Shpellë (Albania)

Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.