eHouse for BESS in Lincolnshire

Lincolnshire (Regno Unito)

Stato

Regno Unito

Anno

2025

Descrizione

Project designed to improve the energy infrastructure in the UK: supply of a fully equipped 33kV switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

The eHouse is equipped with:

  • MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), 4 panels (1 incomer cubicle +3 outgoing cubicles)
  • 110 VDC System with Battery
  • HVAC system
  • Fire Detection system
  • AUX LV Switchboard
  • MV SCADA system
Designed for high performance and reliability, this plug-in compact substation ensures efficient energy management and operational safety.
This project marks another important milestone in our journey to strengthen our presence in the UK market, where we are currently focused on expanding our footprint and delivering innovative, sustainable solutions that support the country’s energy transition.

Progetti correlati a Cabina di campo

eHouse 33kV per sistema BESS – Scozia

Scozia (Regno Unito)

Progettazione, produzione e fornitura di una eHouse 33kV destinata al sistema di stoccaggio di energia a batteria Overhill, in Scozia, Regno Unito.

MANUTENZIONE PRESSO IL POLO LOGISTICO-TECNOLOGICO DI GEWISS

Calicante (Italia)

Attività di manutenzione presso la sede di Gewiss a Calcinate (Bergamo). Nello specifico, si tratta di un intervento di efficientamento illuminazione esterna allo stabilimento.