N. 11 switchrooms for 400MW BESS

Eccles (United Kingdom)

Stato

Regno Unito

Anno

2026

Località
Soluzioni
Prodotti
Descrizione

N. 11 switchrooms and 1 control room for a major 400MW BESS (Battery Energy Storage System) project in Eccles, United Kingdom.

It includes:
- N. 11 Switchrooms 33kV: equipped with MV switchgear, LV protection and control panels, HVAC systems, rectifiers, integrated fire detection and automatic suppression systems.
- N. 1 BESS Control Room: featuring HVAC systems, LV protection and control panels, rectifiers, dedicated fire detection and automatic suppression system.
A key highlight of this project is the fire suppression system within the switchrooms, strictly engineered according to UK standards for hazardous areas. To meet the client’s specific requirements, we integrated strategic partnerships with external specialists into our workflow. This collaboration ensures cutting-edge fire safety, including specialized piping systems for rapid flame suppression.

Progetti correlati a eHouse

eHouse 33kV per sistema BESS – Scozia

Scozia (Regno Unito)

Progettazione, produzione e fornitura di una eHouse 33kV destinata al sistema di stoccaggio di energia a batteria Overhill, in Scozia, Regno Unito.

Sottostazione Compatta STC-Box 35/20/10kV

Peshkopi (Albania)

Progettazione, realizzazione e installazione di una sottostazione elettrica compatta di media tensione (MT) a Peshkopi, zona industriale della città albanese Dibër.