eHouse for BESS in Lincolnshire

Lincolnshire (United Kingdom)

Stato

Regno Unito

Anno

2025

Descrizione

Project designed to improve the energy infrastructure in the UK: supply of a fully equipped 33kV switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.

The eHouse is equipped with:

  • MV air-insulated switchgear ATR 36kV 1250A 25kA(1s), 4 panels (1 incomer cubicle +3 outgoing cubicles)
  • 110 VDC System with Battery
  • HVAC system
  • Fire Detection system
  • AUX LV Switchboard
  • MV SCADA system
Designed for high performance and reliability, this plug-in compact substation ensures efficient energy management and operational safety.
This project marks another important milestone in our journey to strengthen our presence in the UK market, where we are currently focused on expanding our footprint and delivering innovative, sustainable solutions that support the country’s energy transition.

Progetti correlati a Cabina di campo

Energia e agricoltura in sinergia con la nostra eHouse

Montalto di Castro (Italia)

Abbiamo studiato, costruito e messo in servizio una cabina di connessione, eHouse, destinata all’impianto di Guinza Grande a Montalto di Castro, Viterbo.

E-Houses per centrale termoelettrica

Chieti (Italia)

Studio, realizzazione e fornitura di nr. 2 cabine plug-in per la centrale Termoelettrica di Chieti, Italia.