N. 11 switchrooms for 400MW BESS

Eccles (United Kingdom)

Stato

Regno Unito

Anno

2026

Località
Soluzioni
Prodotti
Descrizione

N. 11 switchrooms and 1 control room for a major 400MW BESS (Battery Energy Storage System) project in Eccles, United Kingdom.

It includes:
- N. 11 Switchrooms 33kV: equipped with MV switchgear, LV protection and control panels, HVAC systems, rectifiers, integrated fire detection and automatic suppression systems.
- N. 1 BESS Control Room: featuring HVAC systems, LV protection and control panels, rectifiers, dedicated fire detection and automatic suppression system.
A key highlight of this project is the fire suppression system within the switchrooms, strictly engineered according to UK standards for hazardous areas. To meet the client’s specific requirements, we integrated strategic partnerships with external specialists into our workflow. This collaboration ensures cutting-edge fire safety, including specialized piping systems for rapid flame suppression.

Progetti correlati a eHouse

La nostra eHouse per l’impianto BESS nel Lincolnshire

Lincolnshire (Regno Unito)

Abbiamo progettato, realizzato e fornito una sala di commutazione, concepita per migliorare l'infrastruttura energetica nel Regno Unito: la fornitura di una sala di commutazione STC-Box da 33 kV completamente attrezzata per un sistema di accumulo di energia a batteria (BESS) situato a Grimsby, Lincolnshire.

Sottostazione elevatrice 0,44/13,8-11,4kV per generatori

Rio de Janeiro (Brasile)

Per il nostro cliente Enel Brasile abbiamo progettato, realizzato e fornito una sottostazione elevabile 0.44/13.8-11.4kV con sistemi avanzati di accoppiamento per generatori destinata a Rio de Janeiro.