MV Mobile Substation 23kV
Asunción (Paraguay)
Country
Year
Location
Solutions
Products
Description
Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.
Equipment mounted on the first trailer:
- STC-Box shelter, with electric automation system for opening and closing of the cabin doors
- Medium-voltage (MV) air-insulated (AIS) Normal Clad switchgear (n. 9 cubicles) 24kV 2500A 25kA, equipped with control, protection, and alarming sensors. The electrical switchgear is designed to work both as an independent unit and connected with the main substation system
- Low-voltage (LV) switchboards Euro SDS
- Current and voltage transformers
- Earthing knife switch
- Protection relays
- SCADA system for the remote monitoring
- With accessories needed to guarantee the integrity of the equipment during the transport, against vibrations
- Insulated cables 23kV
- Hydraulic power unit
- Automatic cable reels hydraulic operated
Related projects to SCADA Solution
Nr 2 E-HOUSE 33kV SWITCHING STATION – BUMPER FOR BESS
We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.
HV/MV Substation 110/34.5kV 2x25MVA
Varadero (Cuba)
The project has included the study, installation and supply of the electrical substation "Punta Hicacos".