The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.

The mobile substation 115/37,5/10,5kV 10MVA is made up of two semi-trailers.
On the first one had been installed: voltage-transformer and the high-voltage (HV) hybrid-system equipped with circuit breaker, disconnector, a high-voltage discharger and a power transformer 123kV.
On the second trailer had been installed a shelter with medium-voltage (MV) switchgears, battery system with AC/DC distribution panel, protection and distribution panel, marshalling box, SCADA and unwinder.
This solution compensates for the lack of electricity during the summertime, subject to high rate of tourism flow.

Related projects to Mobile Substation

Mobile Substation 115/13.8 kV 10 MVA

Aragua (Venezuela)

The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.

High-Voltage Mobile Substation 110/20kV 40MVA

Fushë-Krujë (Albania)

Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.