Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.

Fundamental to the realization of the project was the support of the Minister of Infrastructures and Energy, Belinda Balluku, who thanks to this solution was able to guarantee access to electricity in a hostile area. The structure includes ATR medium-voltage switchgears, a shelter for primary distribution 20kV, which powers 120 medium voltage shelter for secondary distribution, 2,500 pole-mounted lamps, guaranteeing public lighting and supporting a network infrastructure that branches off for 130 km.

Related projects to Mobile Substation

N. 2 Mobile Substations 132kV

Bassora (Iraq)

These are the first mobile substations projected and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas.

Mobile Substation 115/37,5/10,5kV 10MVA and Transformer 123kV

Udënisht, Korçë (Albania)

The project has seen the installation of a mobile substation in Udënisht, a well-known touristic area, in Korçë, the sixth most important town in Albania.