HV/MV Substation 110/34.5kV 25MVA
Puerto Escondido (Cuba)
Country
Year
Description
The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of Petrolero, in Puerto Escondido district.
The design, implementation and supply of the project include:
- Hybrid module with a "Y" scheme 110 kV
- N. 7 medium-voltage switchgear cubicles (MV) Normal Clad 36kV, with a frequency of 60Hz
- 25MVA power transformer
- Protection and control system consisting of low-voltage (LV) Euro P&C cells.
Related projects
MV E-House 20kV for Tesla Battery Energy Storage System
West Sussex (United Kingdom)
Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).
HV/MV Substation 110/34.5kV 40MVA
Holguín (Cuba)
Engineering study, construction and commissioning of an outdoor electrical substation HV/MV 110/34.5kV 40MVA for the implementation of the new tourist center of Ramón de Antilla, in Holguín.