Reference
Reference
Project
Location
Year
ELECTRIC SUBSTATION "ISLA DE LA JUVENTUD"
CUBA
2013
«METAL-CLAD»                                                                                                                              MEDIUM VOLTAGE SWITCHBOARDS UP TO 36 kV                                                                                                                                  Construction of a new Distribution Substation 34,5 kV 2 x 25 MVA
CR Technology System S.p.A. worlwide:
Privacy Policy Cookie Policy
Treviglio via Rossaro 9 Cap 24047 - Italy
P.Iva: 01637141001